
Tuas MRT Station
Material Galvanised: Structural Steel – Pipe Frames
Approx. Weight of Steel Galvanised: 300 tons
Scheduled for completion in 2016, the Tuas West Extension extends the East-West Line from Joo Koon MRT Station. The 7.5km extension comprises a twin-tracked viaduct and four above-ground stations. AGV galvanized 300 tonnes of steel pipe frames that are built to last, ensuring low maintenance for a high-traffic station that will carry 100,000 commuters daily.